Project Summary for
Pinecrest Road Yard UST Removal And Investigation
Owner: Tuolumne County
Location: Pinecrest, California
Project Description:
Two 500 gallon USTs which contained gasoline and diesel respectively,
were removed from inside of the shop maintenance building. There was
no evidence of leakage from either the tanks or the piping. Nevertheless,
the bedding material and ground water were contaminated with gasoline
and diesel. American Geological Services, Inc. over excavated the
fill material to clean bedrock. The water was purged with repetitive
pumping and contained no detectable contamination. The ground water
aquifer is over 200 feet deep at the site. The water in the tank excavation
was snow melt from the snow plows and was confined within the impermeable
bedrock. That site has been approved for closure.
Estimated Completion Date: June 1994
Contractor Status: Prime contractor and Project
Manager
Owner Contact: Mr. Bill L'Hommedieu, County of
Tuolumne, 2 South Green St., Sonora, California 95370, (209) 533-5601